Size it to the loads you need
A load calculation should show which circuits the generator will carry. Central air, a well pump and electric cooking drive the size up the most.
Home › Standby generator
Whole-House Standby · Transfer Switch · Gas Line · Concrete Pad · PermitsA natural-gas whole-house generator typically costs $6,000 to $11,000 installed. A 17 to 20 kW unit commonly runs $7,000 to $11,000, and a 22 to 25 kW unit $9,500 or more. The generator is only part of the bill: the transfer switch, the gas line, the pad and the permits add several thousand dollars, so ask for each one separately.
Reviewed 25 October 2026 · Written by Mantu Kumar
See the illustrated inspection guide · How the system works
Source: ThePricer standby generator cost roundup (2025–2026 data); ReplaceCost 2026 planning ranges.
2026 planning ranges
Diagram, part by part
The standby generator installation drawing above has 9 numbered parts, from 17–20 kW to Yearly service and exercise. Each card below frames one of them, and after you run the calculator it shows what that part adds to your estimate.
$7,000–$11,000 installed
A 17 to 20 kW air-cooled standby generator runs most of a typical house, including central air. Smaller units cover essential circuits only, while large homes or electric heat may need more.
What moves it: The loads you want to run and the generator brand.
On the quote: Ask for a load calculation that lists which appliances can run at once.
$1,200–$1,600
The automatic transfer switch senses an outage, starts the generator and moves the house to generator power within seconds, then switches back when utility power returns.
What moves it: Service size and whether the switch is whole-house or essential circuits.
On the quote: Ask whether the switch is rated for your full service and how it handles large loads.
$400–$1,500+
A gas line runs from the meter to the generator. Long runs, a meter upgrade from the utility or a propane tank installation add cost.
What moves it: Distance from the meter and the fuel type.
On the quote: Ask for pipe size and length and whether the utility needs to upgrade the meter.
$100–$450
The transfer switch ties into the main panel. Electrical and gas permits, and sometimes a utility notification, are part of the job.
What moves it: Your town and utility.
On the quote: Ask who pulls the permits and schedules the inspections.
$150–$400
The generator sits on a level composite or concrete pad, above any flood line and clear of drainage paths.
What moves it: Pad type and site grading.
On the quote: Ask whether the pad is included or supplied by the manufacturer.
Sets the gas and wire lengths
Manufacturers and codes set distances from windows, doors and vents so exhaust does not enter the house. Placement decides the gas and wire lengths and often the price.
What moves it: Your lot, the house layout and local rules.
On the quote: Ask for a site plan showing where the generator goes and the clearances.
10–14 kW essentials · 17–24 kW whole house
A smaller generator covers the furnace, refrigerator, well pump and some lights. A whole-house unit also runs central air and kitchen loads. Load management can let a smaller unit cover more by switching large loads off in turn.
What moves it: Which appliances must run during an outage.
On the quote: Ask whether a load manager could let a smaller generator do the job.
Utility may upgrade the meter
A standby generator uses a lot of gas at full load. The utility may need to upgrade the meter, and propane systems need a tank large enough to run for several days.
What moves it: Generator size and your other gas appliances.
On the quote: Ask the installer to check meter or tank capacity before you order the unit.
Ongoing cost
Standby generators run a short self-test every week and need oil, filter and battery service about once a year. Skipping service is the most common reason a unit fails to start in an outage.
What moves it: Run hours and the service plan you choose.
On the quote: Ask about the warranty terms and what yearly service costs.
Size, switch and fuel
Generator quotes differ mostly in size and in what the transfer switch can run. A smaller unit with a load-managed switch can power the essentials; running central air and an electric range at once needs a larger unit.
The three close-ups below show the unit, the wall connections and the clearances to check before you approve a price. These close-ups are crops of the same AI-generated illustration.
A load calculation should show which circuits the generator will carry. Central air, a well pump and electric cooking drive the size up the most.
An automatic transfer switch, usually 200 amps for whole-house coverage, is installed at or near the panel. Confirm the gas meter can supply the generator along with the furnace and water heater.
Exhaust clearances from windows, doors and vents, and setbacks from property lines, decide where the unit can go. A unit that cannot be placed legally is not a bargain.
| Size | Installed cost | Typical use |
|---|---|---|
| 13 kW class | From about $3,957 (unit only) | Essentials: fridge, furnace, lights |
| 17 – 20 kW | $7,000 – $11,000 | Most mid-size homes |
| 22 – 25 kW | $9,500 – $24,000 | Larger homes with central air |
| Natural-gas whole-house setup | $6,000 – $11,000 | Common suburban install |
| Item | Typical cost |
|---|---|
| Transfer switch installation | $1,200 – $1,600 |
| Gas line installation | $400 – $1,500+ |
| Concrete pad | $150 – $400 |
| Electrical permit | $50 – $200 |
| Fuel-line plumbing permit | $50 – $150 |
| Zoning permit | Often under $100 |
| Annual maintenance | $200 – $600 per year |
Size is driven by the loads you want running at the same time. A refrigerator, furnace fan, lights, internet and a few outlets fit a smaller unit. Central air conditioning, a well pump, an electric water heater or an electric range push toward 20 kW and up. Many installers use a load-managing transfer switch that sheds big appliances when needed, which lets a smaller generator cover more of the house.
Ask the installer for a written load calculation. It is the honest way to compare a 14 kW quote with a 22 kW one.
These are the calculator’s default inputs: an 18–24 kW air-cooled unit, natural gas run of moderate length, new pad and automatic transfer switch, national pricing.
| Line item | 2026 planning range |
|---|---|
| 18–24 kW generator with 200A transfer switch (unit) | $6,000 – $9,000 |
| Transfer switch installation | $1,200 – $1,600 |
| Gas line to the pad | $400 – $1,500 |
| Concrete pad | $150 – $400 |
| Permits | $100 – $450 |
| Planning total | $7,850 – $12,950 |
The source’s worked 22 kW example totals $9,764, near the middle of this range. Long gas runs, a meter upgrade or a panel upgrade would add to it.
The calculator's default standby generator installation job, repriced for each of its six regions. At the national average it runs $7,850 – $12,950; South / Lower Midwest is the lowest at $6,830 – $11,267, and West Coast metro is the highest at $10,205 – $16,835, a gap of about $4,472 at the midpoint.
| Region | Planning range | Midpoint |
|---|---|---|
| National average | $7,850 – $12,950 | $10,400 |
| South / Lower Midwest | $6,830 – $11,267 | $9,048 |
| Mountain / Plains | $7,458 – $12,303 | $9,880 |
| Mid-Atlantic / Upper Midwest | $8,792 – $14,504 | $11,648 |
| Northeast metro | $9,891 – $16,317 | $13,104 |
| West Coast metro | $10,205 – $16,835 | $13,520 |
Every other input stays at its default and only “Generator size” changes. The cheapest choice, 10–14 kW air-cooled (essentials), comes to $5,350 – $9,950; the most expensive, 18–24 kW air-cooled, comes to $7,850 – $12,950.
| Choice | Planning range | Midpoint vs default |
|---|---|---|
| 10–14 kW air-cooled (essentials) | $5,350 – $9,950 | −$2,750 |
| 17–20 kW air-cooled | $6,850 – $11,950 | −$1,000 |
| 18–24 kW air-cooled (default) | $7,850 – $12,950 | — |
Every other input stays at its default and only “Gas line” changes. The cheapest choice, Short run, meter close by, comes to $7,850 – $12,250; the most expensive, Long trenched run, comes to $8,950 – $13,950.
| Choice | Planning range | Midpoint vs default |
|---|---|---|
| Short run, meter close by | $7,850 – $12,250 | −$350 |
| Moderate run (default) | $7,850 – $12,950 | — |
| Long trenched run | $8,950 – $13,950 | +$1,050 |
Using the default job, a $1,000 deductible and a 20-year expected life. At 10 years old, about $5,200 is held back as depreciation; a replacement cost policy releases it after the work is finished, while an actual cash value policy keeps it.
| Age | Wear | First check | Held back |
|---|---|---|---|
| 2 years | 10% | $8,360 | $1,040 |
| 5 years | 25% | $6,800 | $2,600 |
| 10 years | 50% | $4,200 | $5,200 |
| 15 years | 75% | $1,600 | $7,800 |
| 20 years | 80% | $1,080 | $8,320 |
| 30 years | 80% | $1,080 | $8,320 |
Standby generator quotes differ most in the work around the unit.
| Stage | Typical time | What happens |
|---|---|---|
| Site visit and load check | 1 – 2 hours | Placement, gas meter and panel review. |
| Permits | 1 – 4 weeks | Electrical and gas permits; some towns need a site plan. |
| Equipment delivery | 1 – 8 weeks | Longer after major storms. |
| Installation | 1 – 3 days | Pad, unit, gas line and transfer switch. |
| Inspection and startup | 1 – 14 days | Inspection, utility sign-off and first run. |
Book the installation before storm season; demand and lead times rise sharply after a regional outage.
Placement and sizing decide most of the price.
These situations favor a standby unit.
A natural-gas whole-house setup typically costs $6,000 to $11,000. A 17 to 20 kW unit is commonly $7,000 to $11,000 installed, and a 22 to 25 kW unit about $9,500 or more.
Transfer switch installation typically runs $1,200 to $1,600, with an average around $1,450. Load-managing switches cost more but can let a smaller generator run more of the house.
It depends on what you want running at once. Essentials fit a smaller unit; central air, a well pump and electric cooking need 20 kW or more. Ask the installer for a written load calculation.
Usually yes. Expect an electrical permit ($50 to $200), a fuel-line permit ($50 to $150) and sometimes a zoning permit, often under $100.
Typically $200 to $600 a year for a service visit, oil and filters, and battery checks.
A permanently installed generator is usually covered as part of the home for covered perils. Some insurers also offer a discount for having one.
Many home standby units run at roughly the noise level of a central air condenser, and the weekly self-test is often quieter. Placement and local noise rules matter for neighbors.
Most standby units can run on either, but output is usually different on each fuel, and propane systems need a tank large enough for several days of running.
It can appeal to buyers in areas with frequent outages, but it rarely returns its full cost at sale. Most owners buy one for reliability, not resale.
Yes. CO alarms should be on every level of the home, especially when any fuel-burning equipment is installed.
On natural gas, as long as gas is supplied. On propane, it depends on tank size and load.
A portable generator with a transfer switch or interlock costs less but must be started manually and run outdoors.
It senses an outage, starts the generator and switches the home to generator power automatically.
Yes. Most units need oil, filter and spark plug service on a schedule set by the maker.
Usually outdoors on a level pad, a set distance from windows, doors, vents and property lines as required by the maker and local code, and close to the gas meter to keep the gas line short.
A whole-house unit sized for the load can. Load management modules and soft-start kits help large AC compressors start without overloading the generator.
Some utilities require notice or an inspection for standby generators and transfer switches. The installer usually handles the paperwork along with the permits.
The next questions after a standby generator estimate usually land on one of these.
Planning topics covered in the calculator and guide above.