Starter strip and drip edge
Both are separate lines from the field shingles. Count them in linear feet along eaves and rakes.
Home › Scope gap checker
Starter · Drip edge · Ice barrier · Flashing · Steep & high charges · O&PMost short roof claims are not short on price per square. They are short on lines: the starter strip, drip edge, step flashing, a steep-roof or two-story charge, a decking allowance, sometimes overhead and profit. Each is a normal part of doing the job, and each has a unit and a quantity you can check. Mark what the adjuster’s sheet already has, and the checker prices what is missing and writes a supplement request you can send.
Reviewed 25 October 2026 · Written by Mantu Kumar
See the illustration · See the live cost diagram · Open the calculator
Unit ranges reflect 2026 insurance repair pricing; your carrier’s price list and local code adoption apply.
2026 planning ranges
Diagram, part by part
The roof claim scope gap drawing above has 9 numbered parts, from Starter strip to Permit and dumpster. Each card below frames one of them, and after you run the calculator it shows what that part adds to your estimate.
per ft of edge
Starter strip is a separate adhesive-backed course laid at the eaves and rakes before the first row of shingles. It seals the first course down in wind, and shingle makers require it for the warranty, so it is priced by the linear foot of edge.
On the quote: Check linear feet on the sheet.
per ft of edge
Drip edge is the bent metal along the eaves and rakes that throws water into the gutter and away from the fascia. The IRC requires it on asphalt shingle roofs where that code is adopted, and it is almost always replaced with a new roof.
On the quote: Cite the local code adoption.
per sq ft
Ice and water barrier is a self-adhering membrane at the eaves and in valleys that seals around nails. It is priced by the square foot and is required in many cold climates from the eave to 24 inches inside the warm wall.
On the quote: Check square feet included.
per ft
A ridge vent lets hot attic air out along the peak. When the old roof comes off, the vent and its cap shingles go with it, so a like-for-like repair includes a new vent priced by the foot.
On the quote: Confirm length.
Step flashing is woven into each shingle course where the roof meets a wall or chimney, and counter flashing covers it. Old pieces are bent or nailed through during tear-off, so new flashing is the normal scope.
On the quote: Photograph existing flashing.
Steep roofs, usually 7/12 and up, and roofs two stories or higher are slower and need more safety gear. Estimating software prices this as a per-square labor charge on top of the shingles.
On the quote: Photograph pitch and height.
Rotted or delaminated sheathing only shows once the shingles are off. A decking allowance, priced per sheet or per square foot, lets the adjuster approve it without a second visit.
On the quote: Ask for a per-sheet price.
10% + 10%
When a job needs a general contractor to schedule and supervise several trades, carriers commonly add 10% overhead and 10% profit on top of the trade costs. Three or more trades is the usual rule of thumb.
On the quote: Explain the coordination needed.
Often left off the sheet
A building permit and a dumpster with haul-away are part of almost every reroof. If they are missing from the adjuster's sheet, they are easy to add with the permit receipt and the dumpster invoice.
What moves it: Your town's fee, roof size and the number of layers removed.
On the quote: Send the permit receipt and the dumpster invoice to the adjuster.
Line by line
Lay the adjuster’s sheet next to your contractor’s proposal and go down it the same way a reviewer would: material, then the edges, then the details where the roof meets walls and vents, then the labor charges that depend on pitch and height.
Three places to look before you sign. These close-ups are crops of the same AI-generated illustration.

Both are separate lines from the field shingles. Count them in linear feet along eaves and rakes.

Where a roof meets a wall or chimney, the flashing is bent or nailed through during tear-off and is rarely reused.

A red line through what is not there, with a quantity and a reason, is the supplement.
| Line | Unit | Range |
|---|---|---|
| Starter strip at eaves and rakes | Linear ft | $2.10 – $3.40 |
| Drip edge | Linear ft | $3.00 – $4.80 |
| Ice and water barrier | Sq ft | $1.90 – $2.90 |
| Ridge vent, cut-in and cap | Linear ft | $9 – $15 |
| Step and counter flashing | Allowance | $450 – $1,200 |
| Steep-roof charge, 7/12 and up | Per square | $30 – $120 |
| Two-story or higher charge | Per square | $12 – $40 |
| Decking allowance | Sq ft | $3.40 – $5.20 |
| House wrap behind new siding | Sq ft | $0.65 – $1.25 |
| Permit; dumpster and haul-away | Each | $200 – $650; $450+ |
Quantities matter as much as the lines. Squares should include a waste factor, often 10% to 15% on a gable roof and more on a hip or cut-up roof. Edge lengths can be measured from satellite reports or a tape on the ground; the calculator estimates them from the squares and pitch if you leave them blank.
| Missing line | Range |
|---|---|
| Starter strip, 214 ft | $449 – $728 |
| Drip edge, 214 ft | $642 – $1,027 |
| Step and counter flashing | $450 – $1,200 |
| Steep-roof charge, 28 squares | $840 – $1,400 |
| Decking allowance, 280 sq ft | $952 – $1,456 |
| Overhead and profit, 10% + 10% | $3,867 – $4,362 |
| Missing from the sheet | $7,200 – $10,173 |
The middle of that range would take the sheet from $16,000 to about $24,700. Without overhead and profit, the missing roof lines alone are about $3,300 to $5,800.
When a job needs a general contractor to schedule and supervise several trades, insurers commonly add 10% overhead and 10% profit on top of the trade costs. The usual rule of thumb is three or more trades, such as a roof, siding and gutters, or a roof plus interior repairs. It is not a law, and carriers differ. If your claim has fewer trades but real coordination, explain why in the request.
The calculator's default roof claim scope scenario, repriced for each of its six regions. At the national average it runs $7,200 – $10,173; South / Lower Midwest is the lowest at $6,680 – $9,266, and West Coast metro is the highest at $8,400 – $12,265, a gap of about $2,360 at the midpoint.
| Region | Planning range | Midpoint |
|---|---|---|
| National average | $7,200 – $10,173 | $8,686 |
| South / Lower Midwest | $6,680 – $9,266 | $7,973 |
| Mountain / Plains | $7,000 – $9,824 | $8,412 |
| Mid-Atlantic / Upper Midwest | $7,680 – $11,010 | $9,345 |
| Northeast metro | $8,240 – $11,986 | $10,113 |
| West Coast metro | $8,400 – $12,265 | $10,332 |
Every other input stays at its default and only “Trades on the claim” changes. The cheapest choice, One or two (roof only, roof and gutters), comes to $3,333 – $5,811; the most expensive, Three or more (roof, siding, windows, interior), comes to $7,200 – $10,173.
| Choice | Planning range | Midpoint vs default |
|---|---|---|
| One or two (roof only, roof and gutters) | $3,333 – $5,811 | −$4,114 |
| Three or more (roof, siding, windows, interior) (default) | $7,200 – $10,173 | — |
Every other input stays at its default and only “Overhead and profit (10% + 10%)” changes. The cheapest choice, On the adjuster’s sheet, comes to $3,333 – $5,811; the most expensive, Missing from the sheet, comes to $7,200 – $10,173.
| Choice | Planning range | Midpoint vs default |
|---|---|---|
| On the adjuster’s sheet | $3,333 – $5,811 | −$4,114 |
| Missing from the sheet (default) | $7,200 – $10,173 | — |
| Does not apply | $3,333 – $5,811 | −$4,114 |
A supplement request is stronger when each missing item has its own evidence.
| Stage | Typical time | What happens |
|---|---|---|
| Compare the estimates | 1 – 3 days | Line up the adjuster's sheet with your roofer's. |
| Send the request | 1 day | In writing, with photos and citations. |
| Insurer review | 1 – 4 weeks | Many states set response deadlines for claims. |
| Re-inspection | If needed | The adjuster may revisit the roof. |
| Revised estimate | 1 – 2 weeks | Approved items are added to the claim. |
Send items found during tear-off, such as rotten decking, before the new roof covers them, with photos of each sheet.
Approved supplements follow a few habits.
Check the sheet for these.
A written request to add items or quantities the adjuster’s estimate left out, such as drip edge, starter strip, flashing or steep-roof charges, with evidence for each line.
Under the International Residential Code (R905.2.8.5), drip edge is required at eaves and rake edges of asphalt shingle roofs. Your city or state decides which code edition applies.
Usually, when the pitch is about 7/12 or steeper. It is a per-square labor charge for safety equipment and slower work, and it rises at 10/12 and 12/12.
Commonly when a general contractor is reasonably needed to coordinate three or more trades. It is typically 10% overhead and 10% profit. Carriers and states differ.
Rotted or damaged sheathing found during tear-off is usually covered as part of the repair. Ask for a per-sheet price in writing before work starts so the supplement is quick.
Yes. Starter is a separate product applied at eaves and rakes, and shingle makers require it for warranty and wind ratings. Cutting field shingles as starter is a different, lower-quality method.
Often one to three weeks, faster with clear photos and a line-by-line request. Some states set time limits for insurers to respond.
Yes, with your permission. You remain the policyholder; ask for a copy of everything sent and received.
Not on its own. Xactimate is the estimating software most adjusters use, and it prices line items such as squares of shingles, drip edge and flashing from measurements. Photos prove the damage and conditions, but the quantities still come from a roof measurement report or tape measurements. Use photos plus measurements, and this checker, to show which line items are missing.
Starter strip, drip edge, ice barrier, flashing, steep and high charges, decking, permits and dumpster are common gaps. Each one has a reason it is required.
Many roofers send supplements and meet adjusters, but state rules limit what contractors may do on a claim. Keep the conversation in writing and stay involved.
Ask for the reason in writing, add any missing evidence and resend. Appraisal and a complaint to the state insurance department are options when a dispute remains.
Estimating software adds a labor charge for steep roofs, typically starting around 7/12, because crews work slower and need safety gear.
Many codes require it at the eaves in areas where ice dams are common. In other areas it may be required by the manufacturer in valleys or not required at all.
A labor charge for roofs on taller homes, where access and safety setup take longer.
Step and counter flashing are often damaged during tear-off and are commonly replaced. Reusing them can lead to leaks.
Extra material to cover cuts, starter and ridge. Estimating software calculates waste based on roof shape.
Permit fees required for the repair are commonly included in the claim estimate.
Overhead and profit, commonly 10% each, added to an estimate when a general contractor is needed to coordinate several trades. Insurers often apply it when three or more trades work on the claim.
Gutters dented by the same storm are often added to the claim. Gutters that must be removed and reset during reroofing may appear as a separate detach-and-reset line.
For simple supplements, many owners and roofers handle the paperwork themselves. Large, complex or disputed claims may justify a licensed public adjuster, who charges a percentage of the settlement.
Use the companion calculators when the job touches another part of the house or the claim.
Planning topics covered in the calculator and guide above.